Information Center

Product Catalog

FAQ

Frequently Asked Questions

Technical details regarding application standards, material quality, and project processes.

All parking garage, factory, and highway projects strictly comply with General Directorate of Highways (KGM) standards, occupational health and safety (OHS) regulations, and international quality norms.

Based on the request, our field technical teams conduct an on-site inspection, take the necessary measurements, and determine the product groups best suited to the site’s traffic volume, thereby completing the design process.

Acrylic, two-component paints, and epoxy coatings—specifically selected based on the intensity of vehicle and pedestrian traffic on the site—feature a technical composition that offers high resistance to wear and harsh weather conditions.

The delivery time is determined based on the site’s square footage and the curing times of the selected application (line marking, epoxy, or installation); the site is delivered in full according to the planned schedule.

We design pedestrian walkways, forklift lanes, storage areas, and emergency exit routes in factories and industrial facilities in accordance with applicable occupational safety and health regulations and color standards. We use high-strength, specialized industrial paints that are resistant to wear and tear and can withstand heavy forklift and pallet jack traffic.

The two-component paints and cold-applied road markings we use cure and fully harden within an average of 15 to 45 minutes, depending on the air temperature. The treated area is safely reopened to vehicle and pedestrian traffic as quickly as possible so as not to disrupt your operations.

After the design phase, we deliver the project on a turnkey basis. In addition to road and parking lot markings, we also install delineators, speed bumps, vehicle stops (wheel stops), column corner protectors, traffic signs, and directional signs using our own team of experts.

Yes. Before implementing new projects, we use specialized methods (such as scraping or erasing) to remove old, worn, or faulty markings from the site without damaging the pavement, thereby preparing the surface for a new and flawless application.

Depending on the project site and traffic volume, we use cold road paints containing glass fragments for high reflectivity, two-component (acrylic-based) paints designed to withstand heavy traffic, and thermoplastic paints. All of our materials are certified and long-lasting.

Epoksi ve Poliüretan Boya Uygulama Kılavuzu

Doğru zemin boyama adımlarını hemen indirin.

Soğuk Yol Çizgi Boyası Teknik Veri Fişi (TDS)

Boya mukavemet ve kuruma sürelerini inceleyin.

Çift Komponentli Boya Karışım ve Sarfiyat Rehberi

Doğru m² boya tüketim tablosunu indirin.

Trafik Levhaları Reflektif ve Sac Ölçü Kataloğu

Tüm levha ürün ebatlarını PDF indirin.

Delinatör ve Hız Kesici Montaj Kılavuzu

Otopark yol ekipmanları kurulum detaylarını inceleyin.